CCNP will be the end of 2009 a major revision
CCNP Prerequisites
Valid CCNA certification
CCNP Exams & Recommended Training
Required Exam(s)
Recommended Training
642-901 BSCI Building Scalable Cisco Internetworks (BSCI)
642-812 BCMSN Building Cisco Multilayer Switched Networks (BCMSN)
642-825 ISCW Implementing Secure Converged Wide Area Networks (ISCW)
642-845 ONT Optimizing Converged Cisco Networks (ONT)
OR
Required Exam(s)
Recommended Training
642-892 Composite Building Scalable Cisco Internetworks (BSCI)
Building Cisco Multilayer Switched Networks (BCMSN)
642-825 ISCW Implementing Secure Converged Wide Area Networks (ISCW)
642-845 ONT Optimizing Converged Cisco Networks (ONT)
Test subjects and test, code-named a major adjustment; will be fully keep pace with the trend of a new version of CCIE V4.0:
1, advanced routing Route v1.0 Exam Number :642-902 (with not many before the change, part of the contents might ISCW here to tune in to the part of the MPLS VPN and EIGRP there IS-IS and IPv6 group of players may be returned to the exchange of !)
2, multi-layer switching Switch v1.0 Exam Number :642-813 (basically no change in how much should be put back into QOS)
3, security, troubleshooting TShoot v1.0 Exam Number :642-832 (which is the door comply CCIE v4.0 examination standards of the 2 hours debugging)
1.00 Implement Layer 2 Technologies ?
1.10 Implement Spanning Tree Protocol (STP)
(a) 802.1d
(b) 802.1w
(c) 801.1s
(d) Loop guard
(e) Root guard
(f) Bridge protocol data unit (BPDU) guard
(g) Storm control
(h) Unicast flooding
(i) Port roles, failure propagation, and loop guard operation
1.20 Implement VLAN and VLAN Trunking Protocol (VTP)
1.30 Implement trunk and trunk protocols, EtherChannel, and load-balance
1.40 Implement Ethernet technologies
(a) Speed and duplex
(b) Ethernet, Fast Ethernet, and Gigabit Ethernet
(c) PPP over Ethernet (PPPoE)
1.50 Implement Switched Port Analyzer (SPAN), Remote Switched Port Analyzer (RSPAN), and flow control
1.60 Implement Frame Relay
(a) Local Management Interface (LMI)
(b) Traffic shaping
(c) Full mesh
(d) Hub and spoke
(e) Discard eligible (DE)
1.70 Implement High-Level Data Link Control (HDLC) and PPP
2.00 Implement IPv4
2.10 Implement IP version 4 (IPv4) addressing, subnetting, and variable-length subnet masking (VLSM)
2.20 Implement IPv4 tunneling and Generic Routing Encapsulation (GRE)
2.30 Implement IPv4 RIP version 2 (RIPv2)
2.40 Implement IPv4 Open Shortest Path First (OSPF)
(a) Standard OSPF areas
(b) Stub area
(c) Totally stubby area
(d) Not-so-stubby-area (NSSA)
(e) Totally NSSA
(f) Link-state advertisement (LSA) types
(g) Adjacency on a point-to-point and on a multi-access network
(h) OSPF graceful restart
2.50 Implement IPv4 Enhanced Interior Gateway Routing Protocol (EIGRP)
(a) Best path
(b) Loop-free paths
(c) EIGRP operations when alternate loop-free paths are available, and when they are not available
(d) EIGRP queries
(e) Manual summarization and autosummarization
(f) EIGRP stubs
2.60 Implement IPv4 Border Gateway Protocol (BGP)
(a) Next hop
(b) Peering
Free Download Latest PassGuide Cisco CCNP 642-813 Certification Exam Braindumps, rapidshare 4shared links(c) Internal Border Gateway Protocol (IBGP) and External Border Gateway Protocol (EBGP)
2.70 Implement policy routing
2.80 Implement Performance Routing (PfR) and Cisco Optimized Edge Routing (OER)
2.90 Implement filtering, route redistribution, summarization, synchronization, attributes, and other advanced features
3.00 Implement IPv6
3.10 Implement IP version 6 (IPv6) addressing and different addressing types
3.20 Implement IPv6 neighbor discovery
3.30 Implement basic IPv6 functionality protocols
3.40 Implement tunneling techniques
3.50 Implement OSPF version 3 (OSPFv3)
3.60 Implement EIGRP version 6 (EIGRPv6)
3.70 Implement filtering and route redistribution
4.00 Implement MPLS Layer 3 VPNs
4.10 Implement Multiprotocol Label Switching (MPLS)
4.20 Implement Layer 3 virtual private networks (VPNs) on provider edge (PE), provider (P), and customer edge (CE) routers
4.30 Implement virtual routing and forwarding (VRF) and Multi-VRF Customer Edge (VRF-Lite)
5.00 Implement IP Multicast
5.10 Implement Protocol Independent Multicast (PIM) sparse mode
5.20 Implement Multicast Source Discovery Protocol (MSDP)
5.30 Implement interdomain multicast routing
5.40 Implement PIM Auto-Rendezvous Point (Auto-RP), unicast rendezvous point (RP), and bootstrap router (BSR)
5.50 Implement multicast tools, features, and source-specific multicast
5.60 Implement IPv6 multicast, PIM, and related multicast protocols, such as Multicast Listener Discovery (MLD)
6.00 Implement Network Security
6.01 Implement access lists
6.02 Implement Zone Based Firewall
6.03 Implement Unicast Reverse Path Forwarding (uRPF)
6.04 Implement IP Source Guard
6.05 Implement authentication, authorization, and accounting (AAA) (configuring the AAA server is not required, only the client-side (IOS) is configured)
6.06 Implement Control Plane Policing (CoPP)
6.07 Implement Cisco IOS Firewall
6.08 Implement Cisco IOS Intrusion Prevention System (IPS)
6.09 Implement Secure Shell (SSH)
6.10 Implement 802.1x
6.11 Implement NAT
6.12 Implement routing protocol authentication
6.13 Implement device access control
6.14 Implement security features
7.00 Implement Network Services
7.10 Implement Hot Standby Router Protocol (HSRP)
7.20 Implement Gateway Load Balancing Protocol (GLBP)
7.30 Implement Virtual Router Redundancy Protocol (VRRP)
7.40 Implement Network Time Protocol (NTP)
7.50 Implement DHCP
7.60 Implement Web Cache Communication Protocol (WCCP)
8.00 Implement Quality of Service (QoS)
8.10 Implement Modular QoS CLI (MQC)
(a) Network-Based Application Recognition (NBAR)
(b) Class-based weighted fair queuing (CBWFQ), modified deficit round robin (MDRR), and low latency queuing (LLQ)
(c) Classification
(d) Policing
(e) Shaping
(f) Marking
(g) Weighted random early detection (WRED) and random early detection (RED)
(h) Compression
8.20 Implement Layer 2 QoS: weighted round robin (WRR), shaped round robin (SRR), and policies
8.30 Implement link fragmentation and interleaving (LFI) for Frame Relay
8.40 Implement generic traffic shaping
8.50 Implement Resource Reservation Protocol (RSVP)
8.60 Implement Cisco AutoQoS
9.00 Troubleshoot a Network
9.10 Troubleshoot a complex Layer 2 network issue
9.20 Troubleshoot a complex Layer 3 network issue
9.30 Troubleshoot a network in response to an application problem
9.40 Troubleshoot network services
9.50 Troubleshoot network security
10.00 Optimize the Network
10.01 Implement syslog and local logging
10.02 Implement IP Service Level Agreement SLA
10.03 Implement NetFlow
10.04 Implement SPAN, RSPAN, and router IP traffic export (RITE)
10.05 Implement Simple Network Management Protocol (SNMP)
10.06 Implement Cisco IOS Embedded Event Manager (EEM)
10.07 Implement Remote Monitoring (RMON)
10.08 Implement FTP
10.09 Implement TFTP
10.10 Implement TFTP server on router
10.11 Implement Switch-module Configuration Protocol (SCP)
10.12 Implement HTTP and HTTPS
10.13 Implement Telnet
Recently, I learned from Cisco Systems certification departments that CCNP will be change at the end of 2009 year !
About in 2009 (western North America time) around Christmas.
Current Valid CCNP Exam Version:
The exam subject and exam number will be change, in order to conform the CCIE Version 4.0.
New Version Path to CCNP@ – Routing and Switching
Required: 642-902 ROUTE Exam
Recommended Learning:
1. “Implementing Cisco IP Routing Course”
2. 5-day instructor led training course
ROUTE E-Learning Bundle
9 hours of self-paced demos
Required: 642-813 SWITCH Exam
Recommended Learning:
1. “Implementing Cisco Switched Networks”
2. 5-day instructor led training course
Required: 642-832 TSHOOT Exam
Recommended Learning:
1. “Troubleshooting and Maintaining Cisco IP Networks”
5-day instructor led training course
2. TSHOOT E-Learning Bundle
9 hours of self-paced demos and exercises
PassGuide Practice Test Questions
1 Comment to CCNP will be the end of 2009 a major revision
Leave a Reply
Categories
Recent Comments
- free movies on CCNP SWITCH 642-813 Cert Kit DVD Video and Quick Reference Preparation
- Ela Balley on cisco ccnp 642-813 study book
- Kerry Nimura on CCNP SWITCH 642-813 Cert Kit: Video, Flash Card, and Quick Reference Preparation Package
- Ira Harnan on CCNP will be the end of 2009 a major revision
- insanity workout on Frequently Asked Questions: CCNP Version 6.0

I like the layout of your blog and I’m going to do the same thing for mine. Do you have any tips? Please PM ME on yahoo @ AmandaLovesYou702